Free tool

How many heats can your track run in an hour?

This calculator turns karts on track, session length, changeover and opening hours into a heats-per-hour rate, heats per day and driver-sessions. An optional price shows full-grid takings. The slider shortens only the changeover and shows the extra heats those minutes would free. Your figures only. Not a benchmark, and not profit.

  • Runs in your browser
  • No sign-up
  • Nothing uploaded
How it is calculated

Rate = 60 ÷ (session + changeover). Heats per day = floor(open minutes ÷ cycle), the same floor as the revenue calculator. Driver-sessions = heats × karts, a full grid. A price, if you type one, multiplies driver-sessions. It is not profit, and there is no fill percentage on this page.

The day you actually run
—Heats per day
—Heats per hour
—Heats in one clock hour
—Driver-sessions

Heats per hour: waiting for karts, session length, changeover and hours.

Minutes saved per changeover

Type a changeover to use the slider.

Worked example, invented the same way as the revenue guide, not a recommendation. Twelve karts, a 10-minute session, a 5-minute changeover, eight hours. Cycle 15 minutes. Rate 4.00 heats per hour. Heats in the day: floor(480 ÷ 15) = 32. Driver-sessions: 384. Two minutes off the changeover makes the cycle 13, and floor(480 ÷ 13) = 36, which is 4 extra heats and 48 extra driver-sessions. Your track's inputs will not be these.

FAQ

Questions

What does heats per hour count?

Sixty divided by the session length plus the changeover. That is the rate. Heats per day is the open minutes divided by the same cycle, floored, which is how the revenue calculator counts sessions. Driver-sessions multiply that by the karts you typed. A heat you cannot staff is not in the formula.

What does the minutes-saved slider change?

Only the changeover. The session length and the karts stay put, and the page runs the floor again. The difference is extra heats and extra driver-sessions. Saving every minute of the changeover assumes the next heat starts as the last one ends.

Is the price a forecast of takings?

No. If you type a price, driver-sessions are multiplied by it, which is a full grid. Fill, no-shows, tax and costs are not in the sum. Leave the price blank and the page will not invent one. It is not profit.