On this page 6 sections
What does the formula count?
An open day has a length. A session plus the gap before the next one is a cycle. The number of cycles that fit is the number of times you can run the grid. Multiply by the karts you will actually put out, not the karts you own if two of them are down. Multiply by the fill you believe, as a percentage of those seats. Multiply by the price of one driver in one session. Floor the drivers, because you cannot sell half a seat. That product is takings for the pattern you described. It ignores no-shows that you did not already fold into the fill.
In symbols, with the names the calculator uses: sessions = floor(open minutes ÷ (session minutes + gap minutes)). Seat-sessions = sessions × karts. Drivers sold = floor(seat-sessions × fill). Takings = drivers sold × price. A second pattern, for a different kind of day, is the same formula again. A week is the first pattern's takings times how many days you run it, plus the second if you added one.
What does a made-up day look like, so the steps are obvious?
These inputs are invented for the arithmetic. They are not a suggestion and they are not a survey. Twelve karts. A ten-minute session. A five-minute gap. Eight hours open. Fill 50%. Price 20 in whatever currency you like, since the unit cancels out of the explanation.
- Open minutes: 8 × 60 = 480. Cycle: 10 + 5 = 15. Sessions: floor(480 ÷ 15) = 32.
- Seat-sessions: 32 × 12 = 384.
- Drivers sold: floor(384 × 0.50) = 192.
- Takings that day: 192 × 20 = 3,840 of the unit you chose.
Change the fill to 70% and the drivers become floor(384 × 0.70) = 268, and the takings 5,360. The price did not move. That is the point of writing the formula down: fill and the number of sessions you can staff move the day by more than a small argument about the last unit of price. Your track's inputs will not be these. Use the calculator, which starts empty.
What does the model leave out?
- Profit. Rent, wages, power, tyres, parts, insurance and tax are not in the formula. A full grid can lose money. This page will not estimate those costs.
- Food, parties and private hire, unless you have already turned them into a price per seat and a fill. The birthday and corporate guides are the better worksheets for those.
- A kart that fails at noon. If you type twelve karts and run ten, you typed the wrong input. The model will not notice.
- Seasonality. Multiplying a good week by fifty-two is how a plan invents a winter. Multiply by the weeks you are actually open.
- A second product in the same hour. If a party takes eight karts out of the public grid, do not also count those eight at the public fill.
The cost side of the same question, still with no borrowed margin, is whether a track is profitable. How the price itself is structured, per race or per lap or by the minute, is the pricing guide.
Why is there no industry average next to the result?
Because this site does not have one it is willing to stand behind, and printing a forum's recollection of turnover would dress a rumour up as a benchmark. Tracks differ by hours, by whether the karts are full on Tuesday, and by what they charge. The only honest comparison is your result this month against your result if the fill moves, or if you add a service you can actually staff. Run the calculator twice. The difference is the insight. A third number from the internet is not.
Repeat visits sit inside the fill. They are not a separate term, which is why they get missed. A guest who comes back on a Tuesday raises the fill of a day you already pay to open. The repeat-rate guide is how you count those people. The revenue model will not do it for you, and it should not, because a percentage of people and a sum of money are different units.
How do you use the model without lying to yourself?
- 01
Type the grid you ran last month, not the grid on the brochure
Karts that actually left the pit, the session length you ran, the gap you ran, the hours you were open. If you do not know the fill, count a week before you type fifty because it feels normal.
- 02
Read the four lines, not only the takings
Sessions, seat-sessions, drivers sold, takings. If the sessions number is a fantasy, the takings number is the same fantasy with a price on it.
- 03
Change one input
Fill, or hours, or price. Not all three. Write down the difference. That is a sensitivity, not a forecast.
- 04
Add a second pattern only for a day that is genuinely different
A quiet weekday is a different fill and often a different price. Mixing it into the Saturday pattern hides the empty grid the weekday guide is about.
- 05
Do not call the result profit, and do not multiply a peak week by a year
Subtract nothing you have not measured. Multiply by the weeks the track is open. Put parties and private hires in their own sum so they are not counted twice.